A solar-powered orchard and farm water system at dusk

Independent power on the farm

Know which power system
needs attention.

Ungrid watches the battery, solar, aggregate load, and weather reported by each compatible farm power system—so a remote reserve problem does not stay invisible.

Existing Victron VRM or EG4 Cloud system required · Read-only · Start with one system free

01 High Load02 Low Battery03 Critical Battery04 Storm Watch

Less blind checking

Remote power should not require
a blind drive.

Ungrid separates unusual aggregate demand, falling reserve, critical reserve, and incoming weather—so you can decide whether to investigate, act now, or prepare ahead.

ReserveSolarLoadWeather

Four signals. Four decisions.

Know what happened.
Know what it needs.

Each alert names the measured condition, shows the confirmed system context, and gives you a practical next move. Ungrid never sends a control command.

High Load AlertBasic + Pro

Investigate unusual demand.

Ungrid sees: Aggregate system-level demand crossed the threshold configured for that system.

What that buys you

Time to investigate unusual consumption before it quietly drains the expected reserve.

Ungrid reports aggregate demand. It does not identify which equipment caused it.

Low Battery AlertEvery plan

Plan the response before the drive.

Ungrid sees: Battery reserve crossed the warning threshold you selected.

What that buys you

Time to reduce flexible loads or prepare backup power while options remain.

Critical Battery AlertEvery plan

Know which system needs attention first.

Ungrid sees: Battery reserve crossed your separate critical threshold.

What that buys you

A distinct escalation from “prepare” to “act now,” with the confirmed reserve and system context in the message.

Storm WatchPro

Prepare before the low-solar window.

Ungrid sees: Incoming weather points to lower solar while reserve still matters.

What that buys you

Time to build reserve and move flexible energy use before the weather arrives.

Energy guidance only. Follow official weather and local emergency guidance.

Know what the power system says. Know what it does not.

Farm Well Power

One remote system.
Three reasons to call.

High Load is a separate system-level signal. Low and Critical Battery are distinct reserve stages. A fresh confirmed reading closes the loop when reserve recovers.

Measured, not inferred

Ungrid can show aggregate demand and reserve movement. It does not diagnose equipment or confirm farm operations.

Illustrative Farm Well Power alertsConfirmed readings
  1. 4:12 PM
    High Load Alert2.1 kW exceeds the 1.5 kW limit

    Investigate unusual aggregate demand before it consumes more of the expected reserve.

    Inspect
  2. 8:05 PM
    Low Battery AlertReserve crossed the 30% warning threshold

    Reduce flexible loads or prepare the backup-power plan while choices remain.

    Prepare
  3. 9:34 PM
    Critical Battery AlertReserve crossed the separate 18% critical threshold

    Prioritize this system and preserve the remaining operating margin.

    Act now
  4. 10:18 AM
    Recovery confirmedReserve reached the configured 36% recovery point

    The prior critical condition cleared at this fresh confirmed reading.

    Recovered

Illustrative Ungrid alerts · Thresholds are configurable · Check frequency depends on plan

Weather-aware reserve

See the low-solar window
before it narrows the plan.

Sunrise Energy Brief is available on every plan. Pro adds Storm Watch, turning incoming low-solar weather into an energy plan while choices remain.

01
Watch

See the window forming.

Connect the forecast to confirmed battery movement and solar recovery.

02
Prepare

Protect the operating margin.

Move discretionary energy use while choices remain.

03
Confirm

Wait for a fresh reading.

Do not confuse an estimate with confirmed system state.

Storm WatchFarm Well Power
36 hours

Low-solar watch

Build reserve before the weather window.

Persistent cloud may reduce solar recovery tomorrow. The strongest remaining charging opportunity is today.

Reserve now61%
Protected floor30%
Solar outlookLow
Next move

Protect reserve and confirm the backup-power plan before weather reduces solar recovery.

Storm Watch turns incoming weather into an energy plan.Energy guidance only. Follow official weather and local emergency guidance.

Clarity without overclaiming

The energy system can tell you
only what it measures.

Ungrid monitors compatible energy telemetry. It does not confirm that a pump is moving water, a tank is full, refrigeration is holding temperature, or irrigation equipment is operating.

A focused pilot

Does your farm system fit?

Start with one fixed power system you own or are authorized to monitor. Confirm the available telemetry before expanding.

01

Vendor account

Do you already use Victron VRM or EG4 Cloud?

02

Fixed installation

Is this a farm power system you are authorized to monitor?

03

Useful telemetry

Does it report battery state, solar, and aggregate load?

04

Read-only authority

Ungrid never sends control commands to the equipment.

Start with the system that matters most

Prove the watch duty
on one farm system.

Connect one compatible system, tune its reserve thresholds, and see whether Ungrid reduces blind checking before expanding.